SPA IWP - Seaford and Carrum Level Crossing Removals

IMG-6840
IMG-6842
IMG-6845
IMG-6843
IMG-6840
IMG-6840
IMG-6842
IMG-6845
IMG-6843
IMG-6840

Project details

  • Name of Project: SPA IWP - Seaford and Carrum Level Crossing Removals
  • Client: Southern Program Alliance (SPA)
  • Date: September 2020 - November 2020
  • Location: Seaford and Carrum
  • Plant Hired/Used on Project: 5 & 8T Excavators, Tandem Tip Truck, Crane Truck, Posie Track Skid Steer and Compaction Equipment

Over the past 3 months BDS Civil and Construction have been assisting SPA in the construction of the ‘Shared User Path’ from Seaford to Carrum. Our team has been preparing the subgrade and subbase prior to forming the 3m wide footpath and pouring approximately 100 lineal meters every second day. We have also been involved in demobing the site compound at the newly constructed Carrum Station, assisting with the asphalt re-sheeting of Station Street and Nepean HWY around Carrum, completing car park civil works and installing street signs for the final handover of Carrum Station.

Tasks successfully completed:
  • Surface preparation
  • Concrete pouring and molding
  • Demobing
  • Asphalt re-sheeting
  • Installing of street signs