SPA AWP2 - Bonbeach and Chelsea Level Crossing Removal

Project details

  • Name of Project: AWP2 - Bonbeach and Chelsea Level Crossing Removal
  • Client: Southern Program Alliance (SPA)
  • Date: April 2020 - November 2020
  • Location: Bonbeach and Chelsea
  • Plant Hired/Used on Project: 5 & 8T Excavators Tandem Tip Truck Crane Truck Posie Track Skid Steer Compaction Equipment

BDS Civil and Construction have been engaged by SPA to construct the new Stage 1 CSR through Bonbeach and Chelsea along Station Street, from Breeze Street, Bonbeach to Berry Ave, Edithvale. The Stage 1 CSR works included the main CSR backbone route, pit installation, local signal routes, ULX’s, cabinet foundation installation and bore connections for both enabling works and permanent works. Stage 2 works are to commence late November.